Vossloh Rail Infrastructure
Eurotunnel ReportageEurotunnel commissioned Vossloh to replace a total of 14 switches on the line running under the English Channel by 2007. Each replacement is to be complete within a time frame of 20 hours.
Get the Flash Player to see this player.
